Since the last update...
Over a previous weekend we fixed plasterboard to one wall and ceiling leaving me to complete the insulation during weekday evenings.
Garage door end |
Rear wall |
Garage door end |
A little 'snot' on the floor to clear up when dry |
Initially I was planning to using gym floor matting, as a covering for the concrete floor, but I've ended up with a couple of sheets of one inch Celotex insulation left over. Rather than discard them we've been thinking how to use them and the floor became a likely spot. Not to add an extra layer of insulation at floor level while the garage is empty would seem to me to be an opportunity missed. So next weekend, the plan is to, screw battens to the floor at 400mm centres with the insulation laid between them, finishing off with 18mm tongue and grooved chipboard floor boarding. Shame I'd not thought of this sooner as I could have laid cable for underfloor heating!
When the floor is in place the electrics can be finished; skirting board installed; architrave added around window, door frame and loft hatches; the room will then be painted, and a workbench built. Once extra security is installed in the door and possibly some cheap carpet laid, I'll be able to move in and get back to working on Tredethy Wharf.
Impressive,makes-my-attempts-at-garage-improvement-look-rough.But-then-your's-is-scalefour-rather-than-OO!