Thursday, 15 July 2010

An excellent Saturday

This is a bit of a late posting of an event that happened recently.

Last Saturday a group of us spent a most enjoyable day at a devout Great Central Railway modeller's house in Oughtibridge. After seeing Bridgehouses at Wakefield North show this year I was intrigued to go along and see his model of Brackley. On the other hand I was hesitant as Bridgehouses is far beyond anything I could expect to build myself and felt I would be way out of my depth in such company. Also being the new boy to P4, with little knowledge of things GC and being a BRWR devotee with SR leanings, I did wonder what my reception would be ....... but I needn't have worried as I was made to feel extremely welcome.

A few of the guys had taken locos to run around Brackley to run them in a little. One loco on test was a J63 which received a lot of praise. This is a loco that I was unfamiliar with but I do like the smaller 0-6-0 tanks, especially with outside cylinders. At the other end of the scale someone else also brought along a Robinson 04 which, when pulling a rake of coal wagons, looked the part and well at home running through Brackley. What I got out of the day more than anything is seeing and hearing how others tackle and solve problems. This was all helped by seeing someone else's layout in the flesh, part complete, in the nude if you like. I do find it difficult to engage exhibitors across a layout at an exhibition while they are busy operating, trying to entertain the punters, even at Scalefour Society exhibitions. I came away from the day wanting to crack into track laying on Tredethy. I was also encouraged by all the talk to start on one of my loco kits. Which one to get to grips with first is the question? The High Level 03 chassis is favourite, but I do fancy giving the Nu-Cast 16xx a go. The DJH 1366 will have to wait until I've built up some confidence and it is all to do with confidence........and after that Saturday I have a little bit more confidence to have a go.

Just about to leave for a few days up in the Lakes then back to a little more work on the Garden Project but I'm sure I will find a few hours to get to grips with some modelling, I can't wait.

I know this will not be read by the host or his wife but I'd like to publicly thank them both for the day and their hospitality. Many thanks.

Thursday, 8 July 2010

A Garden Project

At this week's Scalefour Area Group meeting there was a little banter that I've not entered any postings since 16th June. Hmmmm.......well here come the excuses..........not much has happened on the layout as a major Garden Project has been given priority by the "power that needs to be obeyed". Got to blame someone :-)). We also have a visitor staying with us for a couple of weeks. I then have a holiday coming up which means not much else will happen for at least the next fortnight.

On the plus side.......I was able to complete all sleeper laying for the plain track before the layout boards were put into storage while the visitor is with us. I have also been able to test a couple of old AMR handheld controllers at this week's meeting. They worked but not as well as a Gaugemaster W handheld unit. So the two AMR controllers will do for now but I'll have to save a few pennies for a Gaugemaster controller in the future. I've also received a recent order from Squires for brass tubing and rod for point control, wire, switches, solder etc. for the layout. So when the layout does come out of storage I hope I can press on fairly quickly with track laying and wiring.

Wednesday, 16 June 2010

Germany game

While watching the Germany v Australia game on Sunday I was privileged to be able to put one board on the coffee table and start laying sleepers. Little did I know that I was being photographed........

At this point I was looking at an old Mikes Models LSWR buffer stop while waiting for the glue to go off under weighted down sleepers. I could vaguely remember purchasing a buffer stop many years ago but was starting to think I'd lost it. The previous evening, after one last ditched attempt at searching for it, I eventually found it in one of the many boxes of old railway stuff in the roof. In checking out what buffer stops were used at Wenfordbridge and Wadebridge it should be OK for the siding at Tredethy Wharf.

As for the game, Germany seem to be back to their normal tournament best and look to be a hard side to beat. If England get though the group stage lets hope they don't meet Germany in the quarter finals.

Thursday, 10 June 2010

Sleeper staining

500 sleepers are now stained and ready for laying.

The last batch laid out to dry
Had a problem with my staining mixture. Ran out of my first mixture and when mixing some more to the same recipe it came out too strong. After a little thinning down, with some more isopropyl alcohol, I think I got close enough. I'm trying to achieve a faded grey/brown colour to the sleepers with that almost silvery look they get when weathered. Hope to post better photos once I start laying the sleepers on the layout.

I'm using Exactoscale 1.6mm thick sleepers hoping I'll get some good variation of depth to the ballast. May well be extravagant and use wooden sleepers even where they will be completely covered by roadways and hard-standing in the Wharf area. Initially I'd purchased some copper clad sleepers for these areas. Now my thoughts are as the hard-standing looks like it was compacted earth, not completely up to rail height, tops of chairs and sleeper edges may well be seen in places.

(Note to self - Staining recipe used for this batch : 100ml water + 100ml isopropyl alcohol + 4ml black ink + 5ml sepia ink - each sleeper individually dipped quickly and shaken)

Saturday, 29 May 2010

All this for just three inches

Over the last couple of evenings I have noticed that the layout, being placed on a work bench/table, is definitely at the wrong height for me to work on comfortably. This is probably a sign that I'm getting a bit old. Standing up the layout is far too low and being seated it feels too restrictive and awkward. This has got me thinking about what is the best height for the layout and that I ought to get the layout supports built sooner rather than later.

So with the thoughts that: I am 6' 3" and my partner is 5' 2"; that the layout is being built for my own interest and as a test bed; the layout needs to be at a height that is comfortable for me to build and operate; the layout needs to be at a height that my partner can hopefully appreciate it. My thoughts wandered to the recently suggested height of 4' 3". Initially I thought that this would be a about right but during my lunch break yesterday, to try and help make a decision, I started to draw the diagrams below.


If I put a front fascia on, 18" above track level, to frame the layout, I could still operate the layout without stooping. If I put a back-screen on the layout it would have to be at least 2' tall, however, my thoughts are that I will be operating the layout from the front anyway so a 6'+ back-screen would not be a problem. Looking at the above though I thought that 4' 3" might be a tad too high for my partner, also, is it too high for me to work on comfortably? The track bed might be better at my elbow height which would put it at 4'.

So.........


This might be a better height? Back-screen if fitted would still be 2' high. The bottom of the front front fascia would be just below my eye height but if I stand a little away from the layout it should not be too intrusive. If I sit on a tall stool while operating the layout, the front fascia should not be an issue. My partner would have a more open view with the track bed 3" lower than the above 4' 3". With the track bed being at elbow height it should be more comfortable working on the layout especially when adding scenic detail.

Time will tell, but a track bed height of 4' looks to be favourite. (We'd both better get dressed after the life drawing class........ :-)..)





Wednesday, 26 May 2010

Tredethy Wharf (May update)

This is not much of an update on progress, more a report that the layout has found a home which should help with construction.......

Apart from a fettle with some Bill Bedford W Irons, progress on the layout has been at a standstill from mid April through most of May. Work and social commitments have taken their toll, along with yet more furniture moving and rearrangements. This is all down to my daughter moving out into a flat and the rest of my partner's furniture coming out of storage. With all this going on I had to, yet again, reluctantly loose my 'man space' in the garage. But the upshot of all this is that I've negotiated some space for the layout in the house!

The baseboards for Tredethy Wharf now reside on a bench in what has become my 'man space' in the house. There's not enough space for the eventual complete layout, only the two scenic boards (beggars can't be too choosy) but this has enabled me to dabble a little on the layout for the last couple of evenings.


A while back I mentioned to the local P4 group that I was planning to use cork for the track bed. I was immediately informed that Balsa wood is starting to be recognised as a better material for the track base. Holes have been cut through the ply baseboard under the tie-bar locations for point control and 5mm Balsa has been glued in position. One part completed turnout has also been dropped into place. I was hoping to get the track plan glued in place but I've been side tracked a little this evening staining some sleepers.

The next update should show some good progress........

Monday, 10 May 2010

Saltfleet

This last weekend I spent a very enjoyable Sunday helping (well I like to think I was helping) operate a P4 layout at Cleethorpes Model Railway Exhibition. The layout depicts a 'what might have been' at Saltfleet on the East Coast of Lincolnshire and is the work of two members of the local Scalefour Area Group, Martin and David. It is very much a work in progress and they have worked tirelessly over the last few months to get it to its current stage.


Soon after arriving I was, promptly handed the controls! Well I suppose I had offered and had hoped I'd get some hands on the controls but it had been many a year since I'd been in the drivers seat.......... I then spent the next two hours absorbed in the 65 movement sequence. To my surprise the time flew by and I honestly thought that only half an hour and passed when it was announced 'grub up for first sitting'.


A few things came out of the experience the main one being the use of automated couplings. I've been having thoughts about the merits of 3-link verses automated couplings for many a month and after Sunday it has to be automated couplings. The ease of use under exhibition conditions far out weighs the aesthetics of 3 link couplings. Goods traffic was formed into set rakes with 3-links within the rake and 'Sprat and Winkle' coupling at each end. It all worked well once I'd spotted all the magnets. So next discussion is which automated couplings......?


If my little project comes close to this standard I will be well happy.

Thanks guys........