Showing posts with label Layouts. Show all posts
Showing posts with label Layouts. Show all posts

Sunday, 23 August 2020

An itch that might need scratching (3)

This one is still bubbling away, not quite mature enough yet but it's certainly up for consideration as a project to replace Tredethy Wharf.

Since my last blog (An Itch that might need scratching (2)),  I've been trying to make an acceptable track plan. Using the previously mentioned Railway Modeller article as a starting point I'm hoping the result below is not too far fetched from reality as a potential GWR Branch Line Terminus


Though I've made a couple of minor tweaks to the time table mention in the previous blog this design should fit the bill nicely.

Buildings will primarily be kits modified from the Ratio and Wills ranges. I'll also be making use of Petite Properties and Scalescenes products for some of the non-railway buildings. The plan above shows that I've allowed some buildings to lie over baseboard joints. My thinking is that these buildings will be removable and when in place will help to disguise the baseboard joints. I took the decision to moved the Dairy to the opposite side to that proposed in the magazine article to help hid the exit off the layout under the road bridge. To reduced space and to make track building a "tad" interesting there is one single slip plus one double slip in the arrangement.

I still need to thrash out ideas for the fiddle yard but I think overall the layout should work well. If built it will definitely give me plenty of operation interest, at home and at exhibitions, way beyond those I currently have with Tredethy Wharf.

Monday, 14 May 2012

A cracking weekend

The title sums it up really. My birthday on Friday, followed by playing trains at the local Cleethorpes Model Railway show on Saturday, and then a good few hours on Sunday working on modelling projects.

One of the many modelling related presents I received was a very informative book covering a Summer Saturday working in 1961 on the North Cornwall Line, along with the Wadebridge to Bodmin services, including loco rosters and carriage diagrams. It will become another excellent reference as the Grogley Project unfolds.


Saturday saw me being tea boy and lunchtime operator on Gordon's model of Donington-on-Bain. This was its first public showing and very much a 'work in progress'. However being a local station it generated a great deal of interest about its history, as well as the model's construction.

Donnington-on-Bain

Along with Gordon's model two other P4 members, (Dave and Martin) were at the exhibition showing the initial stages of their next project. They are at the very early stages of building a model of Swan Yard at Great Yarmouth, and had on display location plans, photos, part of a Templot track plan, some stock and the beginnings of the baseboards. There are plans afoot for Swan Yard to make an appearance at next year's Cleethorpes show as a 'work in progress' showing the early stages of track laying, along with Gordon's Fish Dock Road and my Tredethy Wharf making its first public appearance. The organisers are kindly allowing our P4 area group to take over a complete room again next year...

During the exhibition it was also good to catch up with two friends that were members of the defunct Mablethorpe and District Model Railway Club, Steve and Bob. Bob was showings his Winterschlaf layout with Steve as support operator, a position I'll be filling at two exhibitions later this year. There was a good selection of other layouts at the show covering 009, N, HO American. HOm Swiss and OO gauge. Gamston Bank stole the show for me.

The thought that Tredethy Wharf has to be near completion in a year's time has spurred me on. During Sunday I think I managed to banish the two remaining track gremlins, no doubt more will surface as I use the model but for now it's working well. Once I've tidied up the wiring, I'll start to put some flesh on the bones. There are still the hidden sidings to design and build but I am looking forward to making a start on the scenery.

To top off this weekend, my son's band released their first single on iTunes with a supporting video on YouTube. I know it will not be everybody's taste but I do like what they are doing so please forgive me posting the following link...
Shades - A Note from Me (Official Video)
Please pass on this link to anyone you think might be interested. Oh...my lad is the good looking one hitting the skins... :-))

Saturday, 29 May 2010

All this for just three inches

Over the last couple of evenings I have noticed that the layout, being placed on a work bench/table, is definitely at the wrong height for me to work on comfortably. This is probably a sign that I'm getting a bit old. Standing up the layout is far too low and being seated it feels too restrictive and awkward. This has got me thinking about what is the best height for the layout and that I ought to get the layout supports built sooner rather than later.

So with the thoughts that: I am 6' 3" and my partner is 5' 2"; that the layout is being built for my own interest and as a test bed; the layout needs to be at a height that is comfortable for me to build and operate; the layout needs to be at a height that my partner can hopefully appreciate it. My thoughts wandered to the recently suggested height of 4' 3". Initially I thought that this would be a about right but during my lunch break yesterday, to try and help make a decision, I started to draw the diagrams below.


If I put a front fascia on, 18" above track level, to frame the layout, I could still operate the layout without stooping. If I put a back-screen on the layout it would have to be at least 2' tall, however, my thoughts are that I will be operating the layout from the front anyway so a 6'+ back-screen would not be a problem. Looking at the above though I thought that 4' 3" might be a tad too high for my partner, also, is it too high for me to work on comfortably? The track bed might be better at my elbow height which would put it at 4'.

So.........


This might be a better height? Back-screen if fitted would still be 2' high. The bottom of the front front fascia would be just below my eye height but if I stand a little away from the layout it should not be too intrusive. If I sit on a tall stool while operating the layout, the front fascia should not be an issue. My partner would have a more open view with the track bed 3" lower than the above 4' 3". With the track bed being at elbow height it should be more comfortable working on the layout especially when adding scenic detail.

Time will tell, but a track bed height of 4' looks to be favourite. (We'd both better get dressed after the life drawing class........ :-)..)





Monday, 10 May 2010

Saltfleet

This last weekend I spent a very enjoyable Sunday helping (well I like to think I was helping) operate a P4 layout at Cleethorpes Model Railway Exhibition. The layout depicts a 'what might have been' at Saltfleet on the East Coast of Lincolnshire and is the work of two members of the local Scalefour Area Group, Martin and David. It is very much a work in progress and they have worked tirelessly over the last few months to get it to its current stage.


Soon after arriving I was, promptly handed the controls! Well I suppose I had offered and had hoped I'd get some hands on the controls but it had been many a year since I'd been in the drivers seat.......... I then spent the next two hours absorbed in the 65 movement sequence. To my surprise the time flew by and I honestly thought that only half an hour and passed when it was announced 'grub up for first sitting'.


A few things came out of the experience the main one being the use of automated couplings. I've been having thoughts about the merits of 3-link verses automated couplings for many a month and after Sunday it has to be automated couplings. The ease of use under exhibition conditions far out weighs the aesthetics of 3 link couplings. Goods traffic was formed into set rakes with 3-links within the rake and 'Sprat and Winkle' coupling at each end. It all worked well once I'd spotted all the magnets. So next discussion is which automated couplings......?


If my little project comes close to this standard I will be well happy.

Thanks guys........

Monday, 29 December 2008

A lost layout

I found some old photographs of my first portable layout build in the late 1970's. Not very good photos and for some reason I used black and white film. The track plan was lifted from an article in the Railway Modeller as it suited the very limited space I had available at that time. Overall the layout was 9 ft long being two 3 ft x 1 ft boards for the scenic section plus a 3ft x 1 ft fiddle yard. Peco Streamline track with Peco point motors underneath. The buildings were card kits from Prototype Models. It was used a couple of times to promote the Mablethorpe Club in displays and if I remember correctly once at one of the club's exhibitions on an August Bank Holiday Monday. The layout has now long gone but I still have some of the stock, all of the wagons being converted to EM.

Lets hope I can do better this time around.



Monday, 17 November 2008

Gainsborough Model Railway

I remember being taken to see this layout by my dad during my Primary School days and it made a lasting impression. Have been back a few times since and even now the scale and operation of this layout is awesome. Well worth a visit if your in the area.

Thursday, 6 November 2008

Penhallick

http://www.penhallick.co.uk/

A North Cornwall fictitious branch line. Not seen this in the flesh but have used it as a guide to other what might have beens.


Wednesday, 5 November 2008

Treneglos

http://www.staffordrailwaycircle.org.uk/layoutstren.php

I was privileged to see this layout at the York Show at Easter 2007. In my humble opinion it was one of the best if not The Best Layout at the show. It is a well researched and well presented layout. The operation, consistency of construction, and attention to detail put this layout firmly in the region that it is depicting.

If Grogley reaches the stands set by this layout I will be well happy.